Automotive
Getting PTM Corporation Back Into Production the Same Day with Urgent Feed Control Retrofit Support
Same day
Controls failed around 10:00 a.m.; the line was running again by 2:45 p.m.

Case study / Food and Beverage

Project overview
Visionary Manufacturing Solutions supported American Panel, one of the largest walk-in refrigeration manufacturers in the United States, with a new COE cut-to-length line for producing blanks used in walk-in cooler manufacturing. American Panel had purchased its first COE line in 2009, installed in 2010, and the original system became a highly productive and profitable asset for their operation.

Order to install
11 months
From purchase order to a line producing blanks faster than expected after training.
Customer Challenge
American Panel’s production environment is high mix and low volume, requiring the team to cut blanks for the jobs they need to manufacture that day or the next day. Because jobs and materials change frequently, the customer needed a system focused on fast coil changeover, quick blank-to-blank transitions, reduced scrap, and consistent blank quality.
VMS Solution
Visionary helped provide a new COE cut-to-length line designed to build on the success of the customer’s original line while adding newer technology for speed, quality, and efficiency. The upgraded system included technology to support faster coil-to-coil changeover, improved blank flatness, scrap reduction, and easier operation through advanced controls.
Technology Highlights
The new line included modern COE precision straightening technology, Work Roll Advisor, coil outside-diameter monitoring tied into the straightener PLC, work roll adjustments on the fly, auto rewind crop shear functionality, a new servo shear to increase speed and reduce power consumption, and a redesigned PVC film applicator to help reduce scratches on the outside of blanks for downstream processing.
Project Execution
From order to installation, the project timeline was approximately 11 months. After installation, startup, and training, American Panel was able to begin producing blanks faster than expected, reinforcing the value of the upgraded line and the long-term confidence built from their original COE system.
Results
How our customers win
Automotive
Same day
Controls failed around 10:00 a.m.; the line was running again by 2:45 p.m.